I have been wandering around our new building at Western Building Center for the last 2 weeks in awe and appreciation for such a nice project..
Read More

Western Building Center
|

|
Residential | Commercial | Restaurants | Institutional | Office
|
Goodwill Industries
Kalispell, MT
Architect:
Jackola Engineering and Architecture PC
Retail operations improve as this nonprofit moves into a new 14,200 sq. ft. building. Features include an exposed roof system and polished concrete slab throughout, providing a durable and easy maintenance floor finish. The open floor plan offers merchandising flexibility and warehousing efficiency. Meeting an aggressive schedule, Hammerquist Casalegno is pleased to provide this space for this worthwhile cause and community service.
|
|
|
GPIA Fueling Facility
Kalispell, MT
Architect:
Engineers: Billmayer & Hafferman Inc.
Completed in 2011
Four fueling stations service rental car agencies. A controlled cardlock system provides internet access for monitoring account activity. The reclaim system allows fuel removal, placing it back into the supply inventory. This addition to the previously constructed Car Wash enhances operations for agency vehicle maintenance.
|
|
|
GPIA Car Wash Facility
Kalispell, MT
Architect:
Engineers: Billmayer & Hafferman Inc.
Completed in 2010
Hammerquist Casalegno performed sitework and coordinated installation of a state-of-the-art modular carwash system. Environmentally friendly, the reclaim system recycles water back into the car wash supply. The double bay facility serves a partnership of rental car companies. This is the first of several planned phases which will centralize vehicle maintenance operations.
|
|
|
Montana Veterans Home
Columbia Falls, Montana
Architect:
Dowling, Sandholm Architects
Completed in 2010
The project consists of mechanical and electrical up grades to the existing Montana Veterans Home and the addition of a new 40-Bed Wing
|
|
|
DNRC-DEQ LEED CERTIFICATION
Kalispell, Montana
Architect:
Gordon Whirry Architect
Completed in 2009
Work included a new office building, fire cache building and associated site work
|
|
|
Eagle Transit Bus Barn
Kalispell, Montana
Architect:
Architects Design Group PC
Completed in 2010
Eagle Transit's office and bus storage have relocated to a new facility. The multiple buildings provide parking bays, a wash bay, storage space and rest rooms. Hammerquist Casalegno is pleased to provide this facility which enhances the ability to meet the transportation needs of Flathead County residents.
|
|
|
Mackenzie River Pizza, Idaho
Hayden Lake, Idaho
Architect:
Jackola Engineering & Architecture PC
Completed in 2009
Role: CM-GC
Status: Start Date 9/15/08
Partial demolition and remodel of existing 6,000 square foot building. Work includes exterior, dining area, kitchen, and restrooms.
|
|
|
Dr. Stebbins
Kalispell, MT
Architect:
Architect Design Group
Completed in 2009
Role: General Contractor
Status: Start Date 10/3/08
Remodel work of reception area, existing offices, treatment rooms, lab and x-ray areas along with additions of a conference room, office and treatment room. Work will be conducted in phases for offices to remain open during construction.
|
|
|
Bigfork Playhouse
Bigfork, MT
Architect:
Jackola Engineering & Architecture PC
Completed in 2009
Role: CM-GC
Status: Start Date 9/22/08
A redesign and expansion of the theater lobby, relocation of the concession area, and upgrade of the fire protection, heating, ventilation and air conditioning system.
|
|
|
4CAVS Professional Building
Kalispell, Montana
Architect:
Jackola Engineering Architecture
Completed in 2009
Role: CM/G
Status: Under Construction
Three story steel structure framed office building with skybridge
|
|
|
Double Eagle Building
Bigfork, Montana
Architect:
Joe Magaddino Architect
Completed in 2010
Role: CM/GC
Status: Under Construction
5200 sq. ft. masonry commercial building in downtown Bigfork
|
|
|
The Outlaw Inn
Kalispell, MT
Architect:
Jackola Engineering & Architecture
Completed in 2008
Role: General Contractor
Site improvements & exterior colonnade
|
|
|
Glacier Bank
Whitefish, MT
Architect:
Richard W. Smith of Whitefish MT
Completed in 2008
Role: General Contractor
Status: Under construction
7,000 sq. ft. Bank building with a start date of July 2007
|
|
|
Universal Athletics
Kalispell, MT
Architect:
Jackola Engineering and Architecture
Completed in 2007
10,500 square foot commercial lease space
|
|
|
Baker Avenue
Whitefish, MT
Architect:
Jackola Engineering & Architecture PC
Completed in 2007
3,000 sf office building
|
|
|
Pierce RV
3138 Hwy 2 East, Kalispell, MT
Architect:
Jackola Engineering and Architecture PC
Completed in 2007
10,800 sq. ft. steel building
|
|
|
Western Building Center
Kalispell, MT
Architect:
Jackola Engineering and Architecture PC
Completed in 2007
10,500 sq. building addition and remodel
|
|
|
Valley Glass Addition
Kalispell, MT
Architect:
Jackola Engineering and Architecture P.C.
Completed in 2006
Shop Addition
|
|
|
Cherry Creek Village
Kalispell, MT
Architect:
Jackola Engineering & Architecture PC
Completed in 2006
16,000 Sq. feet Retail Complex
|
|
|
Ashley Furniture
Kalispell, MT
Architect:
Jackola Engineering & Architecture PC
Completed in 2005
40,044 Sq. feet Retail Furniture Showroom
|
|
|
Ranch Hand
Eureka, MT
Architect:
Jackola Engineering and Architecture PC
Completed in 2006
Construct a 6,800 sq. ft. building for existing feed and convenience stores and casino
|
|
|
400 West Broadway
Missoula, MT
Architect:
Jackola Engineering & Architecture PC
Completed in 2007
Construct a two-story commercial-residential building consisting of two or three ground-floor retail businesses and three second-floor residential condominiums.
|
|
|
The Galleria
Kalispell, Montana
Architect:
Jackola Engineering & Architecture PC
Completed in 2004
Will bring a Mexican Grill restaurant to the Buffalo Commons neighborhood along with tenants including a Health Food Store as well as Footwear/Clothing Retail.
|
|
|
Whitefish Retail Shop
Whitefish, MT
Architect:
Jackola Engineering and Architecture, PC
Completed in 2002
Wood frame single story building consisting of City Brew, Movie Gallery, Victoria Casino, Papa Murphy's as well as Miracle Ear.
|
|
|
Buffalo Commons Retail Mall
15 Heritage Way Kalispell, MT
Architect:
Jackola Engineering and Architecture PC
Completed in 2003
New locations for City Brew, Movie Gallery, RadioActive and Parkside Federal Credit Union. Wood Frame Structure with Dryvit and Masonry Block Exterior Finish.
|
|
|
525 Railway
Whitefish, Montana
Architect:
Jackola Engineering & Architecture PC
Completed in 2004
17,500 Square Foot 2 story building. 1st floor retail 2nd floor office
|
|
|
Grizzly Mini Storage Expansion
464 Ash Rd., Kalispell, MT
Architect:
Jackola Engineering and Architecture
Completed in 2002
Mini Storage Expansion with an Office/Caretaker Facility
|
|
|
Northwest Pipe Fittings Inc
Kalispell
Architect:
Jackola Engineering and Architecture PC
Completed in 2001
Pre-Engineered metal building with In-Floor heat, showroom and concrete loading docks.
|
|
|
Columbia Falls Movie Gallery
Columbia Falls
Architect:
Jackola Engineering and Architecture PC
Completed in 2004
Wood frame single story building.
Movie gallery and retail/tenant space.
|
|
|
Brookstone Square
Kalispell, Montana
Architect:
Jackola Engineering & Architecture P.C.
Completed in 2000
Multiunit Retail Complex
|
|
|
City Brew / Movie Library
Kalispell, Montana
Architect:
Jackola Engineering & Architecture P.C.
Completed in 2001
Regional Chain of Coffee Shops and Video Stores
|
|
|
Center Street Plaza
Kalispell, Montana
Architect:
Jackola Engineering & Architecture P.C.
Completed in 1997
Multiunit Retail Complex
|
|
|
Penco Power Products
Kalispell, Montana
Architect:
Jackola Engineering & Architecture P.C.
Completed in 2001
Yamaha Dealership
|
|
|
Westbrook Square
kalispell, Montana
Architect:
Jackola Engineering & Architecture P.C.
Completed in 2000
Multi Unit Retail Complex
|
|
|
The Village at Lakeside
Lakeside, Montana
Architect:
L'Heureux PageWerner, PC
Completed in 2000
Mulit unit Retail Complex, Restaurant and Deli
|
|
| 
|
- Jul. 18, 2011
Project Receives Round Up For Safety Grant
Hammerquist Casalegno staff assisted Fair Mont Egan School in identifying the life safety components of the addition and remodel on their campus. As a result of thi...
Read More
DNRC-DEQ LEED CERTIFICATION
LEED CERTIFICATION Hammerquist Casalegno is proud to be part of a Project Team that achieved the
Read More
|