Hammerquist & Casalegno General Contractor Testimonial - Top Quote
I have been wandering around our new building at Western Building Center for the last 2 weeks in awe and appreciation for such a nice project..
Read More
Hammerquist & Casalegno General Contractor Testimonial - End Quote
Western Building Center

Projects  |  Completed  |  Commercial

Residential  |   Commercial  |   Restaurants  |   Institutional  |   Office



Goodwill Industries
Kalispell, MT

Architect:
Jackola Engineering and Architecture PC

Retail operations improve as this nonprofit moves into a new 14,200 sq. ft. building. Features include an exposed roof system and polished concrete slab throughout, providing a durable and easy maintenance floor finish. The open floor plan offers merchandising flexibility and warehousing efficiency. Meeting an aggressive schedule, Hammerquist Casalegno is pleased to provide this space for this worthwhile cause and community service.





GPIA Fueling Facility
Kalispell, MT

Architect:
Engineers: Billmayer & Hafferman Inc.

Completed in 2011

Four fueling stations service rental car agencies. A controlled cardlock system provides internet access for monitoring account activity. The reclaim system allows fuel removal, placing it back into the supply inventory. This addition to the previously constructed Car Wash enhances operations for agency vehicle maintenance.



GPIA Car Wash Facility
Kalispell, MT

Architect:
Engineers: Billmayer & Hafferman Inc.

Completed in 2010

Hammerquist Casalegno performed sitework and coordinated installation of a state-of-the-art modular carwash system. Environmentally friendly, the reclaim system recycles water back into the car wash supply. The double bay facility serves a partnership of rental car companies. This is the first of several planned phases which will centralize vehicle maintenance operations.



Montana Veterans Home
Columbia Falls, Montana

Architect:
Dowling, Sandholm Architects

Completed in 2010

The project consists of mechanical and electrical up grades to the existing Montana Veterans Home and the addition of a new 40-Bed Wing



DNRC-DEQ LEED CERTIFICATION
Kalispell, Montana

Architect:
Gordon Whirry Architect

Completed in 2009

Work included a new office building, fire cache building and associated site work



Eagle Transit Bus Barn
Kalispell, Montana

Architect:
Architects Design Group PC

Completed in 2010

Eagle Transit's office and bus storage have relocated to a new facility. The multiple buildings provide parking bays, a wash bay, storage space and rest rooms. Hammerquist Casalegno is pleased to provide this facility which enhances the ability to meet the transportation needs of Flathead County residents.



Mackenzie River Pizza, Idaho
Hayden Lake, Idaho

Architect:
Jackola Engineering & Architecture PC

Completed in 2009

Role: CM-GC
Status: Start Date 9/15/08

Partial demolition and remodel of existing 6,000 square foot building. Work includes exterior, dining area, kitchen, and restrooms.



Dr. Stebbins
Kalispell, MT

Architect:
Architect Design Group

Completed in 2009

Role: General Contractor
Status: Start Date 10/3/08

Remodel work of reception area, existing offices, treatment rooms, lab and x-ray areas along with additions of a conference room, office and treatment room. Work will be conducted in phases for offices to remain open during construction.



Bigfork Playhouse
Bigfork, MT

Architect:
Jackola Engineering & Architecture PC

Completed in 2009

Role: CM-GC
Status: Start Date 9/22/08

A redesign and expansion of the theater lobby, relocation of the concession area, and upgrade of the fire protection, heating, ventilation and air conditioning system.




4CAVS Professional Building
Kalispell, Montana

Architect:
Jackola Engineering Architecture

Completed in 2009

Role: CM/G
Status: Under Construction

Three story steel structure framed office building with skybridge




Double Eagle Building
Bigfork, Montana

Architect:
Joe Magaddino Architect

Completed in 2010

Role: CM/GC
Status: Under Construction

5200 sq. ft. masonry commercial building in downtown Bigfork



The Outlaw Inn
Kalispell, MT

Architect:
Jackola Engineering & Architecture

Completed in 2008

Role: General Contractor

Site improvements & exterior colonnade



Glacier Bank
Whitefish, MT

Architect:
Richard W. Smith of Whitefish MT

Completed in 2008

Role: General Contractor
Status: Under construction

7,000 sq. ft. Bank building with a start date of July 2007



Universal Athletics
Kalispell, MT

Architect:
Jackola Engineering and Architecture

Completed in 2007

10,500 square foot commercial lease space



Baker Avenue
Whitefish, MT

Architect:
Jackola Engineering & Architecture PC

Completed in 2007

3,000 sf office building



Pierce RV
3138 Hwy 2 East, Kalispell, MT

Architect:
Jackola Engineering and Architecture PC

Completed in 2007

10,800 sq. ft. steel building



Western Building Center
Kalispell, MT

Architect:
Jackola Engineering and Architecture PC

Completed in 2007

10,500 sq. building addition and remodel



Valley Glass Addition
Kalispell, MT

Architect:
Jackola Engineering and Architecture P.C.

Completed in 2006

Shop Addition



Cherry Creek Village
Kalispell, MT

Architect:
Jackola Engineering & Architecture PC

Completed in 2006

16,000 Sq. feet Retail Complex



Ashley Furniture
Kalispell, MT

Architect:
Jackola Engineering & Architecture PC

Completed in 2005

40,044 Sq. feet Retail Furniture Showroom





Ranch Hand
Eureka, MT

Architect:
Jackola Engineering and Architecture PC

Completed in 2006

Construct a 6,800 sq. ft. building for existing feed and convenience stores and casino





400 West Broadway
Missoula, MT

Architect:
Jackola Engineering & Architecture PC

Completed in 2007

Construct a two-story commercial-residential building consisting of two or three ground-floor retail businesses and three second-floor residential condominiums.



The Galleria
Kalispell, Montana

Architect:
Jackola Engineering & Architecture PC

Completed in 2004

Will bring a Mexican Grill restaurant to the Buffalo Commons neighborhood along with tenants including a Health Food Store as well as Footwear/Clothing Retail.



Whitefish Retail Shop
Whitefish, MT

Architect:
Jackola Engineering and Architecture, PC

Completed in 2002

Wood frame single story building consisting of City Brew, Movie Gallery, Victoria Casino, Papa Murphy's as well as Miracle Ear.



Buffalo Commons Retail Mall
15 Heritage Way Kalispell, MT

Architect:
Jackola Engineering and Architecture PC

Completed in 2003

New locations for City Brew, Movie Gallery, RadioActive and Parkside Federal Credit Union. Wood Frame Structure with Dryvit and Masonry Block Exterior Finish.



525 Railway
Whitefish, Montana

Architect:
Jackola Engineering & Architecture PC

Completed in 2004

17,500 Square Foot 2 story building. 1st floor retail 2nd floor office



Grizzly Mini Storage Expansion
464 Ash Rd., Kalispell, MT

Architect:
Jackola Engineering and Architecture

Completed in 2002

Mini Storage Expansion with an Office/Caretaker Facility



Northwest Pipe Fittings Inc
Kalispell

Architect:
Jackola Engineering and Architecture PC

Completed in 2001

Pre-Engineered metal building with In-Floor heat, showroom and concrete loading docks.



Columbia Falls Movie Gallery
Columbia Falls

Architect:
Jackola Engineering and Architecture PC

Completed in 2004

Wood frame single story building.
Movie gallery and retail/tenant space.





Brookstone Square
Kalispell, Montana

Architect:
Jackola Engineering & Architecture P.C.

Completed in 2000

Multiunit Retail Complex



City Brew / Movie Library
Kalispell, Montana

Architect:
Jackola Engineering & Architecture P.C.

Completed in 2001

Regional Chain of Coffee Shops and Video Stores



Center Street Plaza
Kalispell, Montana

Architect:
Jackola Engineering & Architecture P.C.

Completed in 1997

Multiunit Retail Complex



Penco Power Products
Kalispell, Montana

Architect:
Jackola Engineering & Architecture P.C.

Completed in 2001

Yamaha Dealership



Westbrook Square
kalispell, Montana

Architect:
Jackola Engineering & Architecture P.C.

Completed in 2000

Multi Unit Retail Complex



The Village at Lakeside
Lakeside, Montana

Architect:
L'Heureux PageWerner, PC

Completed in 2000

Mulit unit Retail Complex, Restaurant and Deli




RECENT NEWS
- Jul. 18, 2011
Project Receives Round Up For Safety Grant
Hammerquist Casalegno staff assisted Fair Mont Egan School in identifying the life safety components of the addition and remodel on their campus.  As a result of thi...
Read More
FEATURED PROJECT
DNRC-DEQ LEED CERTIFICATION
DNRC-DEQ LEED CERTIFICATION

LEED CERTIFICATION Hammerquist Casalegno is proud to be part of a Project Team that achieved the Read More