Lake McDonald Lodge
Glacier National Park
Architect:
N/A
- Interior renovation of historical lodge + 14 lakeshore cabins
- Created comprehensive work scope documents for each guest unit
- Accelerated schedule during closed season, implemented measure for winter conditions
- Team collaboration with National Park Service + Park Concessionaire
View Image Gallery
( 14 Images )
DNRC-DEQ
Kalispell, Montana
Architect:
Gordon Whirry Architect
Completed in 2009
- LEED accredited
- Unique panelized insulation system
- Provisions for back-up power and automatic transfer switch capability
- Project delivered 4 months early through winter constuction
View Image Gallery
( 48 Images )
Glacier Park International Airport
Kalispell, MT
Architect:
CH2MHill / KIBO Group Architecture PC
Completed in 2013
- Phased terminal improvements during ongoing operations
- TSA security checkpoint expansion
- Integrated security rated turnstyles to/from secure areas
- Expanded boarding area seating and work stations
- Upgraded information displays & surveillance systems
View Image Gallery
( 16 Images )
Smith Valley Fire Hall
Kalispell, MT
Architect:
Mark T. Johnson Architect, Ltd
Completed in 2008
- Largest single span trusses manufacturer ever built at 87' long and 6000 lbs.
- Comprehensive safety meeting covered safe handling of large trusses
- Facility houses 8 fire engine bays, sleeping quarters, full kitchen and community room
View Image Gallery
( 5 Images )
Eagle Transit Bus Barn
Kalispell, Montana
Architect:
Architects Design Group PC
Completed in 2010
- New facility meets transportation needs of county residents
- Pre Engineered metal building
- Multiple buildings provide parking bays, wash bay, storage space and rest rooms
View Image Gallery
( 2 Images )
Flathead County Road & Bridge Dept.
Kalispell, MT
Architect:
Jackola Engineering and Architecture PC
Completed in 2014
- Welding bay addition to County Shop
- Pre-engineered steel structure
- 19' walls accomodate 3 JIB cranes
- Integral exhaust fan system
View Image Gallery
( 16 Images )
Whitefish Park and Recreational
Whitefish, MT
Architect:
Grover and Company, PLLC
Completed in 2007
- New facility of masonry structure / wood framing
- Scope included site development, utilites and paved parking
View Image Gallery
( 5 Images )
Northridge Lutheran Church
Kalispell, Montana
Architect:
Architects Northwest
Completed in 2004
- New addition comprising of a gymnasium, classroom wing and kitchen
- Interlocking rubber tile gym floor
- New 42,000 SF asphalt parking lot
- Precautions to minimize disturbance to residential area
View Image Gallery
( 5 Images )
Church of Jesus Christ of Latter Day Saints
Kalispell, Montana
Architect:
Architects Design Group
Completed in 1998
- Facility provides worship & fellowship areas in classic style
- Classrooms, administrative offices and full kitchen serve congregation
- Full size volleyball court and gymnasium
- Working partnership with denominations building authority
Restoration of Historic Cabins at Glacier Park
Glacier Park Montana
Architect:
Architects Northwest
Completed in 1998
- Resoration of 22 log cabins at Lake McDonald
- Cedar logs and/or bark replaced with meticuous craftsmanship
- Replacement of wood entry stoops
- Maintained historical integrity of lodging rentals
Columbia Falls Food Bank
Columbia Falls, MT
Architect:
Architects Design Group
Completed in 2012
- Expand operations with 1,400 SF addition
- Walkin cooler, freezer and added storage increase capacity
- New overhead doors service added concrete loading dock
View Image Gallery
( 7 Images )
Libby Christian Church
Libby, Montana
Architect:
Jackola Engineering and Architecture
Completed in 2004
- Completed sitework and building shell
- Structure consists of sanctuary, offices and classrooms
- Provided professional consultation & coordination of self performed work by congregation
View Image Gallery
( 8 Images )
University of Montana - NorthWest Agricultural Research Center
Creston, MT
Architect:
Architects Design Group
Completed in 2013
- Complete reroofing on-site residence
- Existing roofing removed exposing rafters
- Ice/Water shield and felt installed over new sheathing
- Ultra Loc metal roof system installed using concealed fasteners
- Gutters and downspouts complete the upgrade
View Image Gallery
( 3 Images )