1417 1st Ave East
Kalispell, MT 59901
ph 406.257.6856 | fax 406.257.8919

On behalf of Fair Mont Eagan School I would like to express my sincere gratitude to each of you and your team for your vital role in the very successful expansion project at our school.

We selected your company very early in this expansion process to serve as our Construction Manager at Risk (CMAR). You were the clear choice for us in that you had a thorough understanding of our campus and facilities and you also clearly embraced our vision for this expansion along with our desire to get the maximum value out of every dollar spent. Prior to obtaining our funding, your professionalism and commitment to the process through the bond attempt, the grant application phase and the design and initial budgeting phases was invaluable..
Read More

Fair Mont Egan School District 3

Projects | Public / Institutional

Lake McDonald Lodge
Glacier National Park

Architect:
N/A

  • Interior renovation of historical lodge + 14 lakeshore cabins
  • Created comprehensive work scope documents for each guest unit
  • Accelerated schedule during closed season, implemented measure for winter conditions
  • Team collaboration with National Park Service + Park Concessionaire


View Image Gallery ( 14 Images )

DNRC-DEQ
Kalispell, Montana

Architect:
Gordon Whirry Architect

Completed in 2009

  • LEED accredited
  • Unique panelized insulation system
  • Provisions for back-up power and automatic transfer switch capability
  • Project delivered 4 months early through winter constuction


View Image Gallery ( 48 Images )

Glacier Park International Airport
Kalispell, MT

Architect:
CH2MHill / KIBO Group Architecture PC

Completed in 2013

  • Phased terminal improvements during ongoing operations
  • TSA security checkpoint expansion
  • Integrated security rated turnstyles to/from secure areas
  • Expanded boarding area seating and work stations
  • Upgraded information displays & surveillance systems


View Image Gallery ( 16 Images )

Smith Valley Fire Hall
Kalispell, MT

Architect:
Mark T. Johnson Architect, Ltd

Completed in 2008

  • Largest single span trusses manufacturer ever built at 87' long and 6000 lbs.
  • Comprehensive safety meeting covered safe handling of large trusses
  • Facility houses 8 fire engine bays, sleeping quarters, full kitchen and community room


View Image Gallery ( 5 Images )

Eagle Transit Bus Barn
Kalispell, Montana

Architect:
Architects Design Group PC

Completed in 2010

  • New facility meets transportation needs of county residents
  • Pre Engineered metal building
  • Multiple buildings provide parking bays, wash bay, storage space and rest rooms


View Image Gallery ( 2 Images )

Flathead County Road & Bridge Dept.
Kalispell, MT

Architect:
Jackola Engineering and Architecture PC

Completed in 2014

  • Welding bay addition to County Shop
  • Pre-engineered steel structure
  • 19' walls accomodate 3 JIB cranes
  • Integral exhaust fan system


View Image Gallery ( 16 Images )

Whitefish Park and Recreational
Whitefish, MT

Architect:
Grover and Company, PLLC

Completed in 2007

  • New facility of masonry structure / wood framing
  • Scope included site development, utilites and paved parking


View Image Gallery ( 5 Images )

Northridge Lutheran Church
Kalispell, Montana

Architect:
Architects Northwest

Completed in 2004

  • New addition comprising of a gymnasium, classroom wing and kitchen
  • Interlocking rubber tile gym floor
  • New 42,000 SF asphalt parking lot
  • Precautions to minimize disturbance to residential area


View Image Gallery ( 5 Images )

Church of Jesus Christ of Latter Day Saints
Kalispell, Montana

Architect:
Architects Design Group

Completed in 1998

  • Facility provides worship & fellowship areas in classic style
  • Classrooms, administrative offices and full kitchen serve congregation
  • Full size volleyball court and gymnasium
  • Working partnership with denominations building authority

Restoration of Historic Cabins at Glacier Park
Glacier Park Montana

Architect:
Architects Northwest

Completed in 1998

  • Resoration of 22 log cabins at Lake McDonald
  • Cedar logs and/or bark replaced with meticuous craftsmanship
  • Replacement of wood entry stoops
  • Maintained historical integrity of lodging rentals

Columbia Falls Food Bank
Columbia Falls, MT

Architect:
Architects Design Group

Completed in 2012

  • Expand operations with 1,400 SF addition
  • Walkin cooler, freezer and added storage increase capacity
  • New overhead doors service added concrete loading dock


View Image Gallery ( 7 Images )

Libby Christian Church
Libby, Montana

Architect:
Jackola Engineering and Architecture

Completed in 2004

  • Completed sitework and building shell
  • Structure consists of sanctuary, offices and classrooms
  • Provided professional consultation & coordination of self performed work by congregation


View Image Gallery ( 8 Images )

University of Montana - NorthWest Agricultural Research Center
Creston, MT

Architect:
Architects Design Group

Completed in 2013

  • Complete reroofing on-site residence
  • Existing roofing removed exposing rafters
  • Ice/Water shield and felt installed over new sheathing
  • Ultra Loc metal roof system installed using concealed fasteners
  • Gutters and downspouts complete the upgrade


View Image Gallery ( 3 Images )

On behalf of Fair Mont Eagan School I would like to express my sincere gratitude to each of you and your team for your vital role in the very successful expansion project at our school.

We selected your company very early in this expansion process to serve as our Construction Manager at Risk (CMAR). You were the clear choice for us in that you had a thorough understanding of our campus and facilities and you also clearly embraced our vision for this expansion along with our desire to get the maximum value out of every dollar spent. Prior to obtaining our funding, your professionalism and commitment to the process through the bond attempt, the grant application phase and the design and initial budgeting phases was invaluable..
Read More

Fair Mont Egan School District 3